Phased renovation of existing, occupied medical facility on the Good Samaritan Regional Medical Center campus.
Projects
First Presbyterian Church Dennis Hall Addition
Project scope includes 6,500 square feet of new historic designed construction including, social hall, full functioning kitchen, restrooms, and connection to historic church.
University of Oregon Gerlinger Hall AAA Studios
This project was a seismic upgrade and conversion of space to for the architectural design discipline. Project highlight is the design and implementation of a new highly efficient mechanical system that exceeds the Oregon Energy Code requirements.
Graf Hall – Oregon State University
Renovation of historic 1922 building’s office and education spaces in an active building on a summertime fast-track schedule.
Samaritan Lebanon Health Center
The Samaritan Lebanon Office Building provides patients with multiple specialties. The facility is a two-story, 26,000 square foot steel structure building.
PeaceHealth University District Emergency Room Renovation
Phased Renovation of Active Emergency Room at PeaceHealth Sacred Heart Medical Center University District